Synergy 5221 - 07-10 Jeep JK 2/4 Door Front Cage Kit User Manual

Page 9

Advertising
background image

17. Install the 3/8-16  UNC  x  1”  bolts  as  shown  with  washers under the head of the bolts,

and flange nuts on the underside. Snug hardware down to secure A-pillar floor plate.

18. Next, install the frame tie in as shown and prep area for welding. However, do not

weld at this time.

19. With the A-pillar floor plates and cage tie-ins mocked into position, we will begin

fitting the A-pillars behind the dash.

20. We will start by removing a few key components of the dash to allow for easier

trimming to fit the A-pillars.

Advertising