Kdqjlqj wkh 2, Vhdo, Iloolqj slvwrq – IKA C 2000 control User Manual

Page 77

Advertising
background image

IKA

-WERKE C 2000 basic / control

Ver. 04 08.07

3DJH 

 &KDQJLQJ WKH 2

¡

VHDO

If a faulty seal is noted while the decomposition vessel is being filled with oxygen

(loud hissing noise), the O

2

seal washer on the filling piston must be replaced.

Faulty seal during the filling process may also result from the decomposition vessel

not being fitted snugly in place. Before checking the seal, make sure the decompo-

sition vessel is snugly in place. (Maintenance menu

2

 

ILOO

)

You can remove an old badly split seal from the piston with tweezers.

To install a new seal, place it in the depression of the decomposition vessel (the

seal surface). Now suspend the decomposition vessel into the filling head of the

measuring cell cover and check to make sure it is properly positioned.

In the Maintenance menu, activate the item:

2

 

ILOO

The seal washer is now located on the piston capillary.

At the end of the filling process, remove the decomposition vessel from the filling

head and release the pressure on it manually.

 &KDQJLQJ WKH 2

¡

ILOOLQJ SLVWRQ

If it should become necessary to replace the filling piston or seal elements, or if it is

difficult to remove the seal ring on the piston, the filling head can be disassembled

as follows:

1

contact spring

2

piston, complete

3

seal washer

4

pressure spring

5

O ring 11 x 2

6

O ring 2 x 1.6

7

filling head

8

centering ring

9

cylinder screw



















GLVDVVHPEOLQJ

WKH ILOOLQJ KHDG

Advertising
This manual is related to the following products: