5 supplemental information, 5 supplemental information -12 – JLG 260MRT Operator Manual User Manual

Page 78

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE

6-12

– JLG Lift –

3121219

4. Wheel nuts should be torqued after the first 50 hours of

operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.

6.5 SUPPLEMENTAL INFORMATION

The following information is provided in accordance with the
requirements of the European Machinery Directive 2006/42/
EC and is only applicable to CE machines.

For electric powered machines, the equivalent continuous A-
Weighted sound pressure level at the work platform is less
than 70dB(A).

For combustion engine powered machines, guaranteed
Sound Power Level (LWA) per European Directive 2000/ 14/
EC (Noise Emission in the Environment by Equipment for
Use Outdoors) based on test methods in accordance with
Annex III, Part B, Method 1 and 0 of the directive, is 109 dB.

The vibration total value to which the hand-arm system is
subjected does not exceed 2,5 m/s2. The highest root mean
square value of weighted acceleration to which the whole
body is subjected does not exceed 0,5 m/s2.

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

35 - 55 ft lbs

(49 - 77 Nm)

65 - 80 ft lbs

(91 - 112 Nm)

90 - 105 ft lbs

(126 - 142 Nm)

Advertising