SECTION 2 - PREPARATION AND INSPECTION

3121637

– JLG Lift –

2-9

General

Begin the "Walk-Around Inspection" at Item 1, as noted
on the diagram. Continue checking each item in
sequence for the conditions listed in the following
checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.

INSPECTION NOTE: On all components, make sure there
are no loose or missing parts, that they are securely fas-
tened, and no visible damage, leaks or excessive wear
exists in addition to any other criteria mentioned.

1. Platform Assembly, Footswitch, Ladder and

Gate - Footswitch in good working order, not
modified, disabled or blocked. Manuals in storage
container, access bar slides up and down properly,
platform properly installed and with both caps
screwed on. See Inspection Note.

2. Platform/Remote Control Station - Switches and

levers return to neutral, decals/placards secure and
legible, control markings legible.

3. Platform Rotator & Machine Bubble Level - See

Inspection Note.

4. Outriggers - See Inspection Note; pads pivot

freely.

5. Electrical Components/Cover Assembly - See

Inspection Note.

6. Boom Sections & Ground Control Station - See

Inspection Note.

7. Drive Tracks - Properly Adjusted. See Inspection

Note.

8. Gas/Diesel Engine & Main Hydraulic Pump, Lith-

ium ION Battery Pack - Free of debris and See
Inspection Note.

9. Swing Drive & Turntable Bearing- Check for

proper lubrication. See Inspection Note.

10. Hydraulic Tank and Hand Pump Assembly -

Hydraulic oil level correct and See Inspection Note.

11. Electric Motor and Ground Components

Hydraulic Valve Sets - See Inspection Note.