SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-12

– JLG Lift –

3121156

General

Begin the "Walk-Around Inspection" at Item 1, as noted on
the diagram. Continue to the right (counterclockwise
viewed from top) checking each item in sequence for the
conditions listed in the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN
CORRECTED.

INSPECTION NOTE: On all components, make sure there
are no loose or missing parts, that they are securely fas-
tened, and no visible damage, leaks or excessive wear
exists in addition to any other criteria mentioned.

1. Platform Assembly and Gate - Footswitch works

properly, not modified, disabled or blocked. Latch,
stop, and hinges in working condition.

2. Platform Control Console - Switches and levers

return to neutral, decals/placards secure and legible,
control markings legible.

3. Rotator - See Inspection Note.

4. Rotator Motion Control Valve - See Inspection Note.

5. Articulating Jib Boom - See Inspection Note.

6. Dual Capacity Limit Switch, Transport Position

Limit Switch - Switches operate properly.

7. Power Track - See Inspection Note.

8. Turntable Bearing and Pinion - No evidence of loose

bolts or looseness between bearing and structure. See
Inspection Note.

9. Right Track - Properly secured plates, no loose or

missing track bolts, no dislocation of the track pins.
Proper tension. See Inspection Note.

10. Final Drive, Both Sides - See Inspection Note.

11. Turntable Lock - Operable; See Inspection Note.

12. Auxiliary Power Pump - See Inspection Note.

13. Bottom Rollers, Right Side - See Inspection Note.

14. Track Carrier Roller, Both Sides - See Inspection

Note.

Figure 2-5. Daily Walkaround Inspection Points - Sheet 1 of 3