JLG 2505 Operator Manual User Manual

Page 82

Advertising
background image

Section 5 - Attachments and Hitches

5-10

31200359

Mechanical Quick Attach

This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-3.

1. Tilt quick attach forward to provide clearance.

Check to be sure lock pin and retainer pin are
out.

2. Align attachment pin with recess in attachment.

Raise boom slightly to engage attachment pin in
recess.

3. Tilt quick attach back to engage attachment.

4. Insert lock pin and secure with retainer pin.

5. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic

Operated Attachment” on page 5-14.

OAL1820

OAL1830

OAL1840

OAL1850

Advertising
This manual is related to the following products: