Function check, Function check -5 – JLG 1250AJP Operator Manual User Manual

Page 33

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121170

– JLG Lift –

2-5

11.

Function Check – Once the “Walk-Around” Inspection is
complete, perform a functional check of all systems in an
area free of overhead and ground level obstructions. Refer to
Section 4 for more specific operating instructions.

IF THE MACHINE DOES NOT OPERATE PROPERLY, TURN OFF THE MACHINE IMMEDI-
ATELY! REPORT THE PROBLEM TO THE PROPER MAINTENANCE PERSONNEL. DO NOT
OPERATE THE MACHINE UNTIL IT IS DECLARED SAFE FOR OPERATION.

Function Check

Perform the Function Check as follows:

1.

From the ground control console with no load in the plat-
form:

a. Check that all guards protecting the switches or locks

are in place;

b. Operate all functions and make sure the Boom Control

System warning light does not come on;

c. Check auxiliary power;

d. Ensure that all machine functions are disabled when

the Emergency Stop Button is pushed in.

e. Ensure all boom functions stop when the function

enable switch is released.

Advertising