SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121170

– JLG Lift –

2-9

General

Begin the "Walk-Around Inspection" at Item 1, as noted on the
diagram. Continue checking each item in sequence for the
conditions listed in the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.

INSPECTION NOTE: On all components, make sure there are no
loose or missing parts, that they are securely fastened, and no vis-
ible damage, leaks or excessive wear exists in addition to any
other criteria mentioned.

1.

Platform Assembly and Gate - Footswitch works prop-
erly, not modified, disabled or blocked. Latch and hinges
in working condition.

2.

Platform & Ground Control Consoles - Switches and
levers return to neutral, decals/placards secure and legi-
ble, control markings legible.

3.

Boom Sections/Turntable - See Inspection Note.

4.

Swing Drive - No evidence of damage.

5.

Wheel/Tire Assemblies - Properly secured, no missing
lug nuts. Inspect for worn tread, cuts, tears or other dis-
crepancies. Inspect wheels for damage and corrosion.

6.

Drive Motor, Brake, and Hub - No evidence of leakage.

7.

Hood Assemblies - See Inspection Note.

8.

Auxiliary Hydraulic Pump - See Inspection Note.

9.

All Hydraulic Cylinders - No visible damage; pivot pins
and hydraulic hoses undamaged, not leaking.

10.

Turntable Bearing - Evidence of proper lubrication. No
evidence of loose bolts or looseness between bearing
and machine.

11.

Steering Spindles and Sensors - See Inspection Note.

12.

Main Hydraulic Pump - See Inspection Note.

13.

Platform Rotator - See Inspection Note.

14.

Jib Rotator - See Inspection Note.

Figure 2-3. Daily Walk-Around Inspection - Sheet 2 of 2