Main assembly – JLG 4394RT Service Manual User Manual

Page 73

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3121249

– JLG Lift –

3-37

9. Place spacer (1H) onto spindle (1A) in hub (1G).

NOTE: Make sure the retaining ring is securely seated in the

groove.

10. Place retaining ring (1I) over the spacer onto spindle

(1A) in hub (1G).

11. At this point the hub-spindle sub-assembly is com-

plete.

Main Assembly

BEWARE OF SHARP EDGES IN COUNTERBORE WHEN INSTALL-
ING THE O-RING

1. Grease o-ring (5) and place it into the counterbore in

hub (1G).

NOTE: O-ring may be stretched or pinched together to make

it fit the counterbore exactly.

2. Oil all exposed surfaces inside hub (1G).

3. Place internal gear (2) into hub (1G) so that its inter-

nal splines mesh with the external splines of spindle
(1A). Oil internal gear (2).

Advertising
This manual is related to the following products: