SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3-12

– JLG Lift –

3121249

8. Heat upper ring with roller cage of double Tapered

Roller Bearing (11) to approximately 189.5° F (70° C)
and mount onto Spindle (34). Allow cooling time of
approximately 15 minutes before continuing assem-
bly.

9. De-grease threads of Spindle (34) and Shaft Nut (4).

Then evenly apply coat of Loctite® 270 to Shaft Nut
(4) threads.

10. Rotate the supporitng ring repeatedly in one direc-

tion only when setting the tapered roller bearing.

a. Tighten Shaft Nut (4) by using an adequate

device with a tightening torque of 627 lb-ft (850
Nm).

b. The Loctite® setting time equals 24 hours at

ambient temperature of 68° F (20° C).

11. After proper bearing setting is completed, hammer

ball with suitable punch, 1.1 - 1.3mm into the spindle
thread. Retain ball in position with expanding plug.

12. Insert a new greased O-Ring (16) into the o-ring

groove of the Supporting Ring (6).