JLG 4394RT Service Manual User Manual

Page 55

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3121249

– JLG Lift –

3-19

17. Remove bearing ring (1). Disassemble spool (2).

18. Disassemble shuttle valve (1). Disassemble throttle

screw with throttle pin (2).

19. Check that there are no scratches or metal deposits

on sliding surface (1), and there is no axial play (2),
(Otherwise: Pistons must be replaced in sets).

20. Check cylinder bores, splines.

21. Check that cylinder track is free of scratches, there

are no traces of wear and no embedded foreign par-
ticles. Make sure there are no scratches on the valve
plate. (Replace ONLY in sets).

1

2

2

1

Advertising
This manual is related to the following products: