JLG 4394RT Service Manual User Manual

Page 40

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3-4

– JLG Lift –

3121249

REMOVAL:

SHUT MACHINE OFF, BRACE AXLES AND CHALK WHEELS TO
PREVENT MACHINE FROM MOVING DURING REPAIRS.

1. Disconnect, cap and label all hydraulic lines

attached to Drive Motor (6). If applicable, disconnect
all electrical wiring.

2. With axle raised and supported, remove the Tires (1)

from the Drive Hub (3) by removing the 9 Lugnuts
(2).

3. Remove the Drive Hub (3) and Drive Motor (6) from

the axle by removing the 6 Bolts (4) and Washers
(5).

4. The Drive Motor (6) can be removed from the Drive

Hub (3) by removing the 2 Nuts (7) and Washers (8).

INSTALLATION:

1. Follow "Removal" procedures in reverse order.

2. Refer to Table 3-1, Wheel Torque Chart when torque-

ing Lugnuts (2).

NOTE: For detailed information on the Drive Hub and Drive

Motor, refer to Section 3.4, Drive Hub (Fairfield) and
Section 3.5, Drive Motor (Sauer).

2

1

4

5

3

7

8

6

1. Tire & Rim

2. Lugnuts

3. Drive Hub (Fairfield)

4. Bolt, 5/8"-11NC x 1 3/4"

5. Hardened Washer, 5/8"

6. Drive Motor (Sauer)

7. Nut, 1/2"-13NC

8. Hardened Washer, 1/2"

NOTE: Rear Axle Shown

Figure 3-2. Drive Assembly - (Fairfield/Sauer)

Advertising
This manual is related to the following products: