Assembly removal, Leveling jacks assembly -30 – JLG 4394RT Service Manual User Manual

Page 99

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3121249

– JLG Lift –

3-63

Assembly Removal

NOTE: Applies to both front and rear of machine.

REMOVAL:

SUPPORT THE LEVELING JACKS ASSEMBLY BEFORE ATTEMPT-
ING ANY REMOVAL AND/OR ASSEMBLY PROCEDURES.

1. Disable machine operation and block all wheels.

2. Remove covers from leveling jack cylinders (refer to

Figure 3-35., Leveling Jack Cylinder Removal).

3. Disconnect, cap and label hydraulic lines connected

to leveling jack cylinders. Disconnect and label all
electrical wiring attached to cylinder and switches.

4. Remove the four bolts (2), nuts (3) and washers (4).

5. Carefully lower assembly from the supports (9).

6. Supports can be removed from chassis by removing

the four bolts (5), nuts (6) and washers (7).

INSTALLATION:

1. Follow Removal Steps in reverse.

NOTE: Torque bolts (5) to 280 lb-ft (379.6 Nm).

2. Uncap and reconnect hydraulic lines and electrical

wires to cylinders and switches.

3. Operate leveling jacks to ensure proper operation.

2

3

4

4

5

6

7

7

8

1

9

1. Leveling Jacks Assembly

2. Bolt, 1/2"-13NC x 1 3/8"

3. Nut

4. Washer

5. Bolt, 3/4" - 10NC x 3 1/4"

6. Nut

7. Washer

8. Plate

9. Support

Figure 3-36. Leveling Jacks Assembly

Advertising
This manual is related to the following products: