General, General -9 – JLG X390AJ Operator Manual User Manual

Page 29

Advertising
background image

SECTION 2 - PREPARATION AND INSPECTION

3128792

– JLG Lift –

2-9

General

Begin the "Walk-Around Inspection" at Item 1, as noted
on the diagram. Continue checking each item in
sequence for the conditions listed in the following check-
list.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE
BEEN CORRECTED.

INSPECTION NOTE: On all components, make sure
there are no loose or missing parts, that they are securely
fastened, and no visible damage, leaks or excessive wear
exists in addition to any other criteria mentioned.

1. Platform Assembly, Footswitch, Ladder and Gate

- Footswitch in good working order, not modified,
disabled or blocked. Manuals in storage container,
access bar slides up and down properly, platform
properly installed and with both caps screwed on.
See Inspection Note.

2. Platform/Remote Station - Switches and levers

return to neutral, decals/placards secure and legible,
control markings legible.

3. Machine Bubble Level - See Inspection Note.

4. Outriggers - See Inspection Note; pads pivot freely.

5. Electrical Components Compartment - Cover

secure. See Inspection Note.

6. Boom Sections & Ground Control Station - See

Inspection Note.

7. Drive Tracks - Properly Adjusted. See Inspection

Note.

8. Gas/Diesel Engine & Main Hydraulic Pump, Lith-

ium ION Battery Pack - Free of debris and See
Inspection Note.

9. Swing Drive & Turntable Bearing - See Inspection

note, Check for proper lubrication.

10. Hydraulic Tank - Hydraulic oil level correct and See

Inspection Note.

11. Electric Engine and Hydraulic Pump - See Inspec-

tion Note.

Advertising