4.11 LIFTING AND TIE DOWN

Lifting

1. Determine gross weight of machine, refer to the

serial number tag, or weigh the individual unit to find
out the gross vehicle weight.

2. Place the booms in the stowed position and properly

aligned. All outriggers are fully retracted and the
tracks are fully widened.

3. Remove all loose items from the machine.

4. Properly adjust the rigging to prevent damage to the

machine and so the machine remains level.

5. The width of the slings must not exceed 2.36 in. (60

mm), the width of the chains must not exceed .984
in. (25 mm), the diameter of the ropes must not
exceed .984 in. (25 mm) in order not to exert a pres-
sure in an abnormal direction on the outrigger plate.

THE USE OF ROPES, CHAINS OR SLINGS WITH LENGTH LESS THAN
10 ft. (3m) COULD CAUSE PERMANENT DAMAGE TO THE MACHINE
OUTRIGGERS.

POWER ON
Clockwise

POWER OFF
Counter-
Clockwise

BATTERY DISCONNECT - LITHIUM-ION - ELECTRIC

(Mounted Inside Left-Side Electrical Component Compartment)

Advertising