Platform control station, Platform control station -3 – JLG 19AMI Operator Manual User Manual

Page 31

Advertising
background image

SECTION 3 - MACHINE CONTROLS AND INDICATORS

3121189

– JLG Lift –

3-3

Platform Control Station

(See Figure 3-3.)

1. POWER/EMERGENCY STOP

A two position mushroomed shaped switch furnishes
power to the platform and ground controls when RESET
(ON). When pushed in (OFF), power is shut off to the
platform and ground controls.

2. PLATFORM UP Button.

When depressed simultaneously with ENABLE button
raises the platform.

3. FUNCTION ENABLE Button.

This (GREEN) button must be depressed for machine to
operate.

4. PLATFORM DOWN Button.

When depressed simultaneously with ENABLE button
lowers the platform.

Figure 3-3. Platform Control Station.

1. Emergency Stop (RED)
2. Platform UP (WHITE)
3. Function Enable (GREEN)
4. Platform DOWN (WHITE)

1

2

3

4

Advertising