SECTION 4 - MACHINE OPERATION

4-8

– JLG Lift –

3121189

4.5 QUICK-CHANGE PLATFORM

(See Figure 4-5.)

The AMI model is equipped with quick-change platform mounts
which will allow quick removal and installation of the currently
available quick-change platforms. The following procedures
describe platform removal and installation:

Platform Removal

1. Remove both pins (4) securing the lower platform support

rail to the platform lower mount (2).

2. Remove both pins (3) securing the upper platform sup-

port rail to the platform upper mount (1).

3. Using either suitable lifting equipment capable of lifting the

weight of the mounted platform, or another person, swing
the lower platform support rail forward, away from the
mast to clear the platform lower mount, then lift the upper
platform support rail up and out of the platform upper
mount. Move the platform clear of the machine and care-
fully set the platform on its base out of the way.

Figure 4-5. Quick Change Platform Mount.