Platform installation, 6 stowing machine, Platform installation -9 – JLG 19AMI Operator Manual User Manual

Page 43: 6 stowing machine -9

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121189

– JLG Lift –

4-9

Platform Installation

1. Using either two people or suitable lifting equipment capa-

ble of lifting the weight of the unmounted platform, lift the
platform and set the platforms’ upper support rail into the
upper platform mount on the mast.

2. Swing the platform lower support rail into the lower plat-

form mount on the mast.

3. Secure the platform support rails with the two (2) platform

upper mount pins, and the two (2) lower platform mount
pins.

The platform is now ready for operation.

4.6 STOWING MACHINE

1. Ensure that platform is fully lowered, turn POWER ON/OFF

key switch (on the Ground Control Station) to the OFF
position.

NOTICE

WHEN MOVING MACHINE PLEASE FOLLOW ALL SAFETY PRECAUTIONS
DESCRIBED IN SECTION 1-5, “TRANSPORT SAFETY” OF THIS MANUAL.
ALSO SEE SECTION 4-6, “TRANSPORTING AND LIFTING” FOR PROPER
PROCEDURES FOR TRANSPORTING.

2. Move machine to a well-protected and well-ventilated

area. If necessary, cover the machine so it will be pro-
tected if in a hostile environment.

3. Set the floor brake when parking machine for an extended

period of time.

4. If necessary remove key from Ground Control Panel

POWER ON/OFF key switch to disable machine from
unauthorized use.

NOTE: If required, DC machine batteries should be charged in

preparation for next work day in accordance with Section
2-7, “Battery Charging” (DC Machines).

Advertising