1. System Installation

Here is what you can find in this section:

1.1 Select of the Installation part
1.2 Unwrapping and Control
1.3 Installation

Selection of the Installation Site

The  following  aspects  shall  be  taken  into  consideration  while  selecting  a  site  for  the
system installation:

Good accessibility:

All  interfaces  for  the  connection  of  the  telecommunication  interfaces  or  data  network
connections, as well as the switch-on, switch-off and system reset controls are placed
on the front side.

Protection against humidity and extreme temperatures:
The appliance may never be placed close to heat sources (radiators)
or places exposed to direct sunshine. Also places with high humidity
(such as bathrooms and cellars), places with significant temperature
fluctuation (next to doors, windows, air-conditioning), dusty places
(workshops, etc.) or places exposed to aggressive gases (accumulator
room, boiler room) as well as places with intensive vibrations and
places exposed to shocks (compressor rooms, heavy industrial
operations) should be avoided. The system should be installed
horizontally.

Installation of infrastructure in the building:

The system was designed for installation in a 19" rack and connection to the structured
wiring  infrastructure  with  termination  at  a  CAT  3  or  CAT  5  patch  panel.  If  the
infrastructure is already ready the switchboard installation site is usually given and can
not be further changes. The interface must however be adjusted for the connection via
RJ 45 8/8 plugs.