Caron 7403-33 User Manual
Page 12

7400 Series Operations Manual
Rev A 07/25/14
Page 12 of 83
SECTION 3 - INSTALLATION
Unpacking
Your new unit has been thoroughly packaged to avoid shipping damage. However, the
unit should be fully inspected upon arrival before signing for receipt. If the package has
visual damage, notes should be made on the freight bill and signed by the delivery
company. In the event of concealed damage after the unit is uncrated, keep the carton
and packaging material. Call the shipping company within 7 days of receipt, request
inspection and retain a copy of the inspection report.
Caron provides full on-site installation services for all models. Our installation services
guarantees the proper set-up and startup of all equipment. Please contact the Service
Department at 740-373-6809 or
for details.
Choosing a Location
To ensure proper operation, the unit must be located on a firm level surface, capable of
supporting approximately 800 pounds. The unit should be located in an 18°C – 25°C
ambient area and where there is no direct airflow from heating and cooling ducts as well
as out of direct sunlight. Allow four inches of clearance on all sides of the product to
allow for connections and airflow.
The unit requires a dedicated electrical connection. Depending on the options
purchased with unit a floor drain may be required. Choose a location where these
facilities are or can be made available. If a water source, or a drain is not available,
contact CARON customer service and ask about our CRYS102 product line or click this
web link for information on the product:
http://www.caronproducts.com/65
This product weighs in excess of 500 pounds.
Ensure that sufficient resources are available to
safely move the product.