Repeat the procedure for the second groove – General Machine Products 89010 Breeze Micro Fiber Cable Blowing Machine User Manual

Page 23

Advertising
background image

Page 23 of 43

General Machine Products Co., Inc.

11. Procedure for replacing the air box housing seal

Cut a length of

 0.08inch seal-

ing material 2 1/8” long (a little
longer than is necessary).

Apply a thin coat of 3M Rubber
and Gasket Adhesive to the top of
the cut sealing material

Place the pre-cut length in the groove,
glue surface down, starting at the end
with the retainer plate and aligning
flush with the end of the groove.

Work your way around, pressing the
seal into the groove and allowing the
excess material to hang over the oppo-
site side.

Repeat the

procedure for

the second

groove

Trim excess material flush with
end of groove.

Spread adhesive along one
side of cord.

Advertising