General Machine Products 89000 Cable Blowing Machine(Previous) User Manual

Page 17

Advertising
background image

Page 17 of 64

General Machine Products Co., Inc.

12. Ensure all air has exhausted from the air chamber

and sub-duct. Open the air chamber and sub-duct
clamp and withdraw the sub-duct. Add GMP’s Air-
Glide lubricant to the sub-duct at the rate of 1
quart (.95 liters) of lubricant per 2000 ft (600 m) of
sub-duct assuming a 1 1/4 bore. Adjust quantity
for different bore sizes. Note: Never open the air
chamber until the air pressure gauge reads
zero.


13. Insert a suitable foam plug into the sub-duct and
re-fit the sub-duct into the air chamber and secure
with the sub-duct clamp as already described. The
foam plug should be sized so as to be a snug fit in the
sub-duct. By blowing this plug down the sub-duct the
lubricant will be evenly distributed along the length of
the sub-duct. Before blowing the plug through the sub-
duct, ensure the sub-duct cable exit retaining device is
fitted at the end of the run, to prevent the plug flying
out of the open end of the sub-duct causing injury.



14. Re-fit the air chamber lid ensuring correct location on the dowels and tighten down the 4

retaining screws.

Advertising