Procedure for replacement of cable collets – General Machine Products 89000 Cable Blowing Machine(Previous) User Manual

Page 41

Advertising
background image

Page 41 of 64

General Machine Products Co., Inc.

9. PROCEDURE FOR REPLACEMENT OF CABLE COLLETS

Ensure the air supply is disconnected from the blowing machine before
carrying out this procedure.

Tools Required 4mm Allen Key


Step 1
Collet Removal
▪ Ensure that the air valve is closed and the air pressure is at

zero.

▪ Open the air chamber to expose the collets.
▪ Remove the socket head cap screw (2) using a 4mm Allen

key and remove the collet (2)


Step 2
Collet Refitting
▪ Select the replacement collets (refer to appendix 7 for collet information)
▪ Clean the air chamber with a dry cloth.
▪ Fit the appropriate collets and secure with a socket head cap screw using a 4mm Allen key.

The collet with horizontal O-ring grooves is fitted into air chamber base.

▪ Re-new any worn or damaged radial cord seals and always renew both air chamber split

cord seals. Ensure there is sufficient cord to butt up to the sub-duct and the cable seal.

Note: Correct fitting of the cord seals is a major factor in air leakage from the air cham-

ber.


▪ Close the air chamber.

NOTE: The main seals in the air chamber consist of a 3mm cord seal, which is cut to
the correct length and permanently fixed with adhesive.

Advertising