General Machine Products 89000 Cable Blowing Machine(Previous) User Manual

Page 25

Advertising
background image

Page 25 of 64

General Machine Products Co., Inc.

26. The emergency stop button is set. (i.e. in upper po-

sition). If not set, twist counter-clockwise to reset.



















27. Connect the two hydraulic hoses and the emergency stop cable from the power pack (or

hydraulic power source). Never run the blowing machine without the emergency stop ca-
ble being connected. NOTE: Only authorized, fully trained operators should be al-
lowed to operate the hydraulic power pack (or hydraulic power source).

28. Check the air valve is in the closed position and connect the air

supply from the compressor (if not already connected).

NOTE: ENSURE THE AIR VALVE REMAINS IN
THE CLOSED POSITION UNTIL REQUIRED.




29. NOTIFY INSTALLATION TEAM


Notify installation team that preparations are complete and cable blowing opera-
tions are ready to commence.

30. Note: Only authorized, fully trained operators should be allowed to operate the air

compressor and the power pack/hydraulic power source. Ensure that both services
are available and running and have enough fuel for the duration of the blowing op-
eration. Note: the air shut off valve is till in the closed position.

!

Advertising