Maintenance schedule – General Machine Products 89000 Cable Blowing Machine(Previous) User Manual

Page 35

Advertising
background image

Page 35 of 64

General Machine Products Co., Inc.

PROCEDURE DAILY

WEEKLY

MONTHLY

Clean all assemblies and components thoroughly

Inspect hydraulic hoses for leaks and cracks

Inspect fasteners, screws and retaining pins / wire

Check / adjust chain tension

Check tractor drive pads for wear / damage

Clean air chamber

Check / replace cord seals

Check / replace cable seals

Tire pressure / condition

Check condition of emergency stop lead

Clean rod infeed guide bracket and collets

Clean measuring wheel measuring disc and speed pick
up probe

Function of electronic panel

Oil the frame pivot points

Grease jacking screw thread

Oil air chamber adjusting screw

Oil Oilite bearings with light machine oil

Grease mounting frame axles

Clean and lubricate chain*

Clean and lubricate the chain support slide bars

Check the condition of service and spare 12V DC battery

Check condition of the compressed air hose

7.1. MAINTENANCE SCHEDULE

* Should be more often if subjected to abnormal use and / or excessive contamination.

Advertising