Heidolph Synthesis 1 User Manual

Page 63

Advertising
background image

63

E

1.1.2 Install head

The head is shipped as an assembly (with O-ring and cap). Head may be dismantled
for cleaning. For re-assembly use tool as shown.

1.1.3 Built-in rotary valve


in OPEN POSITION, handle points towards vacuum / inert gas fitting, whereas in
CLOSED position, handle is 90° offset.

handle

valve
OPEN

valve
CLOSED

septa
(plug)

tool

head

cap

O-ring

flange, folds
up during
installation

head
installed

Advertising