Lenze · Controller-based Automation · PROFINET® Communication Manual · DMS 1.2 EN · 04/2014 · TD17
27
6
Commissioning of the PROFINET
6.2
The commissioning steps in detail
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. Click the Scan network button.
4. Select the suitable
controller for the IP address entered under 2. and activate it by
means of the
Set active path button (or by double-click).
5. Now you can carry out the following actions using the »PLC Designer«: