2 optimising the system, Optimising the system, 8defining the cycle time of the plc project – Lenze PROFINET Controller-based Automation User Manual

Page 35

Advertising
background image

Lenze · Controller-based Automation · PROFINET® Communication Manual · DMS 1.2 EN · 04/2014 · TD17

35

8

Defining the cycle time of the PLC project

8.2

Optimising the system

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

8.2

Optimising the system

How to optimise the system:

1. Use the menu command Online Login, or log in on the Lenze controller with <Alt>+<F8>.

With the log-in, the I/O device configuration is loaded into the controller.

2. Check the task processing times.
3. Optimising the cycle times:

• If technologically required, the cycle times of the remaining tasks with lower priorities

can be decreased.

• Condition: No task with a low priority must assign more than 60 percent of the

corresponding cycle time in its task utilisation.

Advertising