Electrical installation – Lenze E94AZPM User Manual

Page 44

Advertising
background image

Electrical installation

Wiring
Terminal assignment

4

l

44

EDK94ZPM113 DE/EN/FR/ES/IT 4.0

1

2

SSP94IT001

Fig. 4−4

Plugging the IT insulating cap onto the earthing jumper

Proceed as follows to disconnect the internal connection between the filters
and PE:
1. Remove IT insulating cap from the parking position

 in the installation

backplane.

–

For this apply a screwdriver on the right or left and lever off the
insulating cap.

–

Optionally the insulating cap can be carefully removed using an
appropriate pliers.

2. Attach IT insulating cap to the earthing jumper

‚ until it clicks into place.

Motor

Terminal X105
(right part)

Labelling

Description

U
V
W

Connection of the motor phases

"

Functional earth
Connect the shields of the motor phases and of the
optional motor brake control separately and with a
surface as large as possible to the shield sheet. Use
EMC wire clamp or EMC shield clamp for fixing.

+

Connection for the PE conductor on the motor side
with M5 ring cable lug

SSP940X105

Advertising