Electrical installation – Lenze E94AZPM User Manual
Page 44
Electrical installation
Wiring
Terminal assignment
l
44
EDK94ZPM113 DE/EN/FR/ES/IT 4.0
1
2
SSP94IT001
Fig. 4−4
Plugging the IT insulating cap onto the earthing jumper
Proceed as follows to disconnect the internal connection between the filters
and PE:
1. Remove IT insulating cap from the parking position
in the installation
backplane.
–
For this apply a screwdriver on the right or left and lever off the
insulating cap.
–
Optionally the insulating cap can be carefully removed using an
appropriate pliers.
2. Attach IT insulating cap to the earthing jumper
until it clicks into place.
Motor
Terminal X105
(right part)
Labelling
Description
U
V
W
Connection of the motor phases
"
Functional earth
Connect the shields of the motor phases and of the
optional motor brake control separately and with a
surface as large as possible to the shield sheet. Use
EMC wire clamp or EMC shield clamp for fixing.
+
Connection for the PE conductor on the motor side
with M5 ring cable lug
SSP940X105