2 maintenance operations, 1 opening the condensation drain hole, Maintenance operations – Lenze GSS User Manual

Page 61: Opening the condensation drain hole, Chapter 8.2.1, Maintenance

Advertising
background image

Maintenance

Maintenance operations

Opening the condensation drain hole

8

l

61

BA 12.0023−EN 7.0

8.2

Maintenance operations

8.2.1

Opening the condensation drain hole

)

Note!

ƒ

Depending on the mounting position, the condensation drain holes are
always at the bottom of the motor!

ƒ

For condensate drainage
– the motor must be deenergised;
– the plugs (screws) must be removed.

(

Stop!

To restore the enclosure, re−insert the plugs (screws) after condensate
drainage. If the condensation drain holes are not sealed again, the IP enclosure
of the motor will be reduced. For horinzontal motor shafts to IP23 and for
vertical motor shafts to IP20.

The required maintenance intervals strongly depend on the corresponding ambient and
operating conditions. Initially, the condensation drain holes should be opened more
frequently (at least once a week) to obtain experimental values for the condensate
quantity arising.

0

Fig. 15

Motor with condensation drain holes

0 Condensation drain holes

Advertising
This manual is related to the following products:

GKR, GKL, GKS, GFL, GST