7
Commissioning
Before switching on
EDK82ZAFLC−001 DE/EN/FR 5.0
50
l
H1inbet−bevor
7
Commissioning
Before switching on
(
Stop!
Before switching on the standard device with the function module for the first
time, check ...
ƒ
the entire wiring with regard to completeness, short circuit, and earth
fault.
ƒ
whether the bus system is terminated at the first and last physical node by
the integrated active bus terminating resistor. (