Commissioning steps, 7commissioning – Lenze E82ZAFUC010 User Manual

Page 66

Advertising
background image

7

Commissioning

Commissioning steps

EDK82ZAFUC010 DE/EN/FR 4.0

66

l

H2_Inbetriebnahmeschritte−inbetrieb−schritte

Commissioning steps

)

Note!

Do not change the setting sequence.

Step

Description

Detailed
information

1.

Configure master system (CANopen master) for communication with
the function module.

^ 69

2.

Inhibit standard device via terminal 28 (CINH).

l

Set terminal 28 to LOW level.

l

Later the standard device can be inhibited and enabled via the
bus.

Documentation
of the standard
device

3.

Connect mains voltage and, if available, separate voltage supply of
the function module.

l

After approx. 1 second the standard device will be ready for
operation.

l

Controller inhibit (CINH) is active.

^ 73

4.

Check status display.
Response

l

The two−colored LED "Connection status to the standard device"
(

0

) is constantly illuminated with a green light .

l

The LED "Status of the CANopen communication" (

1

) is blinking.

Precondition: Other nodes have to be already connected to the
bus.

l

Keypad:

dc

(if plugged in)

^ 74