Project' 'object access rights, L-force | plc designer – Lenze PLC Designer PLC Designer (R2-x) User Manual
Page 193

L-force | PLC Designer
The Individual Components
DMS 3.2 EN 02/2011 TD29
191
6.4.13
'Project' 'Object Access rights'
With this command you open the dialog box for assigning access rights to the
different user groups. The following dialog box appears:
Dialog box for assigning access rights
Members of the user group 0 can now assign individual access rights for each user
group. There are three possible settings:
• No Access: the object may not be opened by a member of the user group.
• Read Access: the object can be opened for reading by a member of the user group
but not changed.
• Full Access: the object may be opened and changed by a member of the user
group.
The settings refer either to the currently-selected object in the Object Organizer or, if
the option Apply to all is chosen, to all POUs, data types, visualizations, and resources
of the project.
The assignment to a user group takes place when opening the project through a
password request if a password was assigned to the user group 0.
Please regard also the possibility to assign access rights concerning the operation of
visualization elements (Visualization, Security).