OPERATING ON WET CONCRETE

Once the engine is warm
and running by itself with
the choke OPEN you can
begin screeding concrete .

For specific instructions on
Wet Screeding and Form to
Form screeding please see
pages 10 and 11 .

1 . Begin by placing concrete within your forms slightly higher
than the forms themselves .
2 . Place screed on top of concrete and start engine .
3 . Increase engine RMP until the clutch engages causing
the screed to vibrate .
4 . Walking backwards, begin screeding concrete (see page 10
for Wet Screeding or Page 11 for Form to Form screeding) .
5 . Your throttle lever does not require constant contact, but
you can adjust RMP and vibration to accommodate wet or
dry concrete . Dry or low slump concrete may require
more vibration to level and screed
6 . Continue moving backwards while keeping concrete placed
in front of the blade . The roll back feature of the blade will
keep help keep concrete from sliding over the blade .
Concrete placed too high may slide over the board! This
could make the screed too hard to pull and result in a slab
that is out of level .


DO NOT OVER VIBRATE CONCRETE!
The following are signs of too much vibration:

• Excessive concrete splatter
• Blade sinking below wet pads
• Ripple or “wake marks” following the blade
• Concrete easily sliding underneath form boards causing dips

along the form edge


Always remember,

the less vibration the better . Use only

enough vibration to be able to comfortably pull screed back-
wards, leaving a smooth, level surface .

!