MK Diamond MK-1280 Gas User Manual

Page 28

Advertising
background image

28

MK-1280 GAS SAW

MAINTENANCE

MICRO-V BELT INSPECTION, ADJUSTMENT AND REPLACEMENT

NOTE:

When a new belt is installed, it should be inspected and re-tensioned after the

first forty-eight (48) hours of operation.

MICRO-V BELT

Fig. A

Remove Outer Belt Guard

Fig. B

Check Belt tension

Fig. C

To change tension loosen all

four engine mount bolts

Fig. D

Tighten or loosen belt tension

as required

Fig. E

Tighten Engine mount bolts

Fig. F

Replace outer Belt Guard

COOLING FLOW
“Rodding” cooling channels is performed by removing the flow control valve and then inserting a

small wire rod through the cooling channel inlet, on the top of the Blade Guard and directing the rod

out through each of the diamond blade cooling flow outlet ports, located on the underside of the Blade

Guard. The cooling channels should be “rodded” until each of the outlet ports are open and free of

foreign debris.

Advertising
This manual is related to the following products: