Installation, Installation 23 – MTS Series 609 Alignment Fixture User Manual

Page 23

Advertising
background image

Series 609 Alignment Fixture Product Information

Installation

23

Installation

This section describes how to install the Series 609 Alignment Fixture.

As shown in the following figure, the Series 609 Alignment Fixture is installed
between the force transducer and crosshead. The mounting stud threads through
the crosshead, through the 609 Alignment Fixture, and then screws into the force
transducer.

Alignment Fixture Components

Stud

Preload Nut
Washer

Adapter Bushing

Stud
Jackbolts (6)

Preload Nut

Washer

Crosshead

Alignment Fixture

Force Transducer

Upper Grip

25 kN (5.5 kip) Installation

50 kN (11 kip) Installation

Advertising