Installation, Installation 23 – MTS Series 609 Alignment Fixture User Manual
Page 23
Advertising
Series 609 Alignment Fixture Product Information
Installation
23
Installation
This section describes how to install the Series 609 Alignment Fixture.
As shown in the following figure, the Series 609 Alignment Fixture is installed
between the force transducer and crosshead. The mounting stud threads through
the crosshead, through the 609 Alignment Fixture, and then screws into the force
transducer.
Alignment Fixture Components
Stud
Preload Nut
Washer
Adapter Bushing
Stud
Jackbolts (6)
Preload Nut
Washer
Crosshead
Alignment Fixture
Force Transducer
Upper Grip
25 kN (5.5 kip) Installation
50 kN (11 kip) Installation
Advertising