MTS SWIFT 45 GLP Sensor User Manual
Page 40
SWIFT
®
45 GLP Sensors
40
Road and Track Vehicles
Installation
C.
Repeat Step 6A for the final torque.
7. Tighten the M20 mounting bolts.
A.
Following the sequence shown in the previous figure, torque the eight
M20 bolts (1 through 8) to the value for the first increment shown in
the following table.
B.
Repeat Step 7A for the second increment.
C.
Repeat Step 7A for the final torque.
8. Refer to Step 4. Finish tightening the 32 hub adapter bolts.
A.
Following the sequence shown in the previous figure, torque the 32
M12 bolts (1 through 32) to the value for the first increment shown in
the following table.
B.
Repeat Step 8A for the second increment.
C.
Repeat Step 8A for the final torque.
Note
To minimize negative clamping effects, you must torque the bolts in the
sequence shown.
B
OLT
S
IZE
T
ORQUE
I
NCREMENT
M12
M20
1st Increment
32.5 N·m (24 lbf·ft)
168.1 N·m (124 lbf·ft)
2nd Increment
65 N·m (48 lbf·ft)
336.2 N·m (248 lbf·ft)
Final Torque
97.6 N·m (72 lbf·ft)
501.6 N·m (370 lbf·ft)