MTS SWIFT 45 GLP Sensor User Manual

Page 40

Advertising
background image

SWIFT

®

45 GLP Sensors

40

Road and Track Vehicles

Installation

C.

Repeat Step 6A for the final torque.

7. Tighten the M20 mounting bolts.

A.

Following the sequence shown in the previous figure, torque the eight
M20 bolts (1 through 8) to the value for the first increment shown in
the following table.

B.

Repeat Step 7A for the second increment.

C.

Repeat Step 7A for the final torque.

8. Refer to Step 4. Finish tightening the 32 hub adapter bolts.

A.

Following the sequence shown in the previous figure, torque the 32
M12 bolts (1 through 32) to the value for the first increment shown in
the following table.

B.

Repeat Step 8A for the second increment.

C.

Repeat Step 8A for the final torque.

Note

To minimize negative clamping effects, you must torque the bolts in the
sequence shown.

B

OLT

S

IZE

T

ORQUE

I

NCREMENT

M12

M20

1st Increment

32.5 N·m (24 lbf·ft)

168.1 N·m (124 lbf·ft)

2nd Increment

65 N·m (48 lbf·ft)

336.2 N·m (248 lbf·ft)

Final Torque

97.6 N·m (72 lbf·ft)

501.6 N·m (370 lbf·ft)