Transport, scope of delivery, installation, Caution – Retsch Cryomill User Manual

Page 20

Advertising
background image

Transport, scope of delivery, installation

20

CAUTION

Blocked pipe
Ice formation

Ice or impurities can block pipes and thereby cause malfunctions.

Keep the cooling system and supply pipe dry and free from
impurities.

Do not insert the grinding jar if it is damp or covered with frost.

Insert the cooling jacket seal (KA) if you will not be using the device
for a long period.

Do not operate the device unattended.

Pos : 5. 32 /00010 Bedi enungsanleit ung en Kapitels ammlungen/Cr yoMill II /0006 Tr ansport, Li ef erumf ang und Aufs tell en / 0020 Cr yoMill II M odul Kühl mant el Abdic ht ung @ 5\ mod_1344926871592_9.doc @ 34120 @ @ 1

Advertising