Auto cal 2.set span <hc, Preparation, Calibrating the gx-94 – RKI Instruments GX-94 User Manual

Page 35

Advertising
background image

GX-94 Operator’s Manual

Page 34

with the fixed flow regulator and RKI Four Gas Cylinder. It also includes
instructions for calibration with individual gas sources.

Preparation

1. Take the GX-94 to a non-hazardous location with fresh-air condi-

tions.

2. Turn on the instrument and allow one minute to warm up.
3. Perform a demand zero.

Press and hold the AIR/

button on the control panel until. The

instrument will indicate on the display that it is adjusting the zero
settings. Keep pressing the AIR/

button until the display indicates

“ZERO ADJUSTED RELEASE AIR KEY”.

The instrument will automatically set the LEL and toxics circuits to
zero and the O

2

circuit to 20.9%.

4. Screw the adapter plate to the threaded hole in the sensor screen.
5. Connect the calibration tubing from the adapter plate to the regula-

tor.

Note

Do not screw the fixed flow regulator onto the cylinder at this
time since sample will automatically start to flow.

Calibrating the GX-94

Press and hold the (SHIFT)/

button, then press the DISPLAY/(ADJ.)

button to enter calibration mode. The calibration menu will show the fol-
lowing screen with a flashing number indicating the cursor position:

1.AUTO CAL

2.SET SPAN
<HC>

Advertising