A ir g a s – RKI Instruments SM-2009U User Manual

Page 24

Advertising
background image

20 • Setting the Bump Test and Calibration Parameters

7. Use the BUMP

and CAL.

buttons to set the parameter to the

desired value, then press and release the EDIT ENTER button.
The “E” next to the battery icon will disappear.

8. Repeat step 5 - step 7 to set any other parameters.

9. When you are done setting the parameters, use the BUMP

button to scroll past AUTO-C. The DECISION screen will appear
momentarily to indicate that the parameter changes have been
saved and then the GX-2009 will return to the TRANSMIT screen.

Setting the Calibration Parameters

Do the following to set the calibration parameters after establishing a
connection between a GX-2009 and the SM-2009U.

1. Turn on the SM-2009U with a GX-2009 and establish a connection

between them as described above in "Turning On the SM-2009U
with a GX-2009". The GX-2009 will display the TRANSMIT screen.

2. Press and release the EDIT ENTER button. The GX-2009 will

display the following screen.

3. Press and release the CAL.

button. The GX-2009 will display the

following screens alternating between the two calibration
parameters and their settings.

4. If you wish to cancel setting the calibration parameters or were just

viewing the parameters to confirm their values, press and release
the CAL.

button to return to the TRANSMIT screen.

50 12.0

TRANSMIT

CO ppm H2S ppm

CH4 %LEL OXY vol%

50 25.0

BUMP/CAL

A ir G A S

CAL

3 0 6 0

CAL

Advertising