Chapter 3: installation and start up, Overview, Mounting the beacon 200 gas monitor – RKI Instruments Beacon 200 User Manual

Page 16

Advertising
background image

16 • Overview

Chapter 3: Installation and Start Up

Overview

This chapter describes procedures to mount the Beacon 200 Gas Monitor,
make wiring connections to the monitor, and start up the monitor.

WARNING: Perform all installation and start-up procedures in a

“fresh air” environment (known to be free of combustible
gas, toxic gas, and of normal oxygen content). The
Beacon 200 is not in operation as a gas monitoring
system until the start-up procedure is complete.

Mounting the Beacon 200 Gas
Monitor

Perform the following procedure to install the Beacon 200 at the mounting
site.

1. Select the mounting site. When you select the mounting site consider

the following factors:

Is an AC or DC power source available?

Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?

Are the display screen and status lights visible?

2. Close and latch the housing door.

3. Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet

from the floor).

4. The Beacon 200 is shipped with the mounting feet positioned behind

the housing. Loosen the screws that secure the feet to the housing,
rotate the feet to their mounting position (as shown in Figure 4), then
tighten the screws.

5. Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at

each corner of the housing to secure the housing to the mounting
surface (see Figure 4).

Advertising