RKI Instruments Beacon 200 Rig Monitor, LEL/LEL User Manual
Page 19
Advertising
![background image](/manuals/571397/19/background.png)
Beacon 200 Rig Monitor Operator’s Manual • 14
1. Select the mounting site. When you select the mounting site consider
the following factors:
•
Can the 12 VDC battery be installed within 50 feet of the Rig
Monitor?
•
Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?
•
Are the display screen and status lights visible?
PILOT
FAIL
Ø .31 x .50 slot, 4X
8.0 Max
Mounting
Feet, 4X
7.00
3/4 Conduit
Hubs (4X)
3/4 Cable
Bushings (3X)
Buzzer
RESET
AL AR M 1
AL AR M 2
.41
Reset
Switch
6.45
10.94
10.50
6.00
8.50
4.83
GAS MONI TOR
BEACON 200
Figure 5. Rig Monitor Outline and Mounting Dimensions