RKI Instruments Beacon 200 Rig Monitor, LEL/LEL User Manual

Page 42

Advertising
background image

37 • Beacon 200 Rig Monitor Operator’s Manual

If the Rig Monitor is able to successfully make the calibration
adjustment, it will display the message Cal Passed for: Channel 1
Channel 2
. It will then return to the first calibration program screen
which asks if you want to continue or escape from the program. Press
ESCAPE to return to normal operation.

If the Rig Monitor is not able to make the calibration adjustment, it will
display the message Not Enough Response! CAL Failed for:
Channel 1 Channel 2,
then return to the first calibration program
screen which asks if you want to continue or escape from the program.
Press ENTER to start the calibration process again or ESCAPE to
return to normal operation.

18.Unscrew the calibration gas cylinder from the fixed flow regulator and

disconnect the sample tubing from the calibration cup hose barb.

NOTE: Be sure to allow enough time between the application of

calibration gas and returning to normal operation for the gas
reading to return to normal levels to avoid false alarms. The alarm
circuits are active when the Beacon 200 Rig Monitor returns to
normal operation.

19.Store the components of the calibration kit in a safe place.

Advertising