RKI Instruments Beacon 200 Rig Monitor, LEL/LEL User Manual

Page 20

Advertising
background image

15 • Beacon 200 Rig Monitor Operator’s Manual

2. Close and latch the housing door.

3. Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet

from the floor).

4. The Rig Monitor is shipped with the mounting feet positioned behind the

housing. Loosen the screws that secure the feet to the housing, rotate
the feet to their mounting position (as shown in Figure 5), then tighten
the screws.

5. Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at

each corner of the housing to secure the housing to the mounting
surface (see Figure 5).

6. Hang each LEL detector junction box using the mounting bracket.

Ensure that the detectors are facing down.

Detector
Cable
Channel 2

To Right

Cable

Bushing

1.50

.75

Ø .75

12 VDC

Battery

Cable

Detector
Cable
Channel 1

To Left

Cable

Bushing

To Middle

Cable

Bushing

12.2 Max

Figure 6. LEL Detector Outline and Mounting Dimensions

Advertising