RKI Instruments GX-2009 User Manual

Page 50

Advertising
background image

50 • Setting Commands

Calibration After Bump Test Failed

Calibration automatically begins after a failed bump test if set to
On (factory setting).

Updating an Instrument’s Detail Settings

Follow these steps to update an instrument’s detail settings:

1. Launch the GX-2009 User Setup Program as described in

“Launching the Program” on page 14.

2. Connect the GX-2009 to the User Setup Program as

described in “Connecting a GX-2009 to the User Setup
Program” on page 15.

3. With the Read Command Buttons now active, click

Instrument Information to retrieve the instrument’s
parameter configuration. The program indicates that it is
downloading information from the instrument.

4. The instrument’s parameter configuration is now loaded in

the User Setup Program.

Figure 39: Instrument Information Downloading

Advertising