Rockwell Automation 1758-RTU202 Datasite Installation Instructions User Manual
Page 8
Advertising

8 DataSite Natural Gas Flow Meter and Remote Terminal Unit
Publication 1758-IN001C-EN-P - June 2011
4. Slide the clamp out while pushing the controller fully onto the DIN rail (1). When the
controller is properly aligned on the DIN rail (2), slide the clamp in, so that it makes
direct contact with the lower edge of the DIN rail (3).
5. Tighten the clamp screws.
Follow these steps to remove your controller from the DIN rail.
1. Loosen the two clamp screws until the clamp can slide out, taking care not to dislodge
the clamp screws from the clamp.
2. Remove the controller.
44538
44539
44540
DIN rail
1
2
3
Advertising
This manual is related to the following products: