User experience prerequisites, Reference documents – Rockwell Automation T6050 SurgeGard Incipient Surge-Conditioning Module User Manual

Page 12

Advertising
background image

ICS Triplex Turbo Machinery Control

PD-6050 Dec 04

2

User Experience Prerequisites

To effectively use the T6050, users should have some experience with the use of digital control
systems, or have an instrumentation background. It is assumed that the personnel involved
understand the basics of electronic control systems and good wiring practices. It is also assumed that
personnel involved have access to the required tools.

Extremely advantageous, though not required, is experience with Windows-based software programs,
compressor operation, and normal operations experience within a plant environment.

Reference Documents

T6050 Operations & Maintenance Guide

Advertising