Unpacking and inspection, Mounting, Top view front view side view – Rockwell Automation T6050 SurgeGard Incipient Surge-Conditioning Module User Manual

Page 18

Advertising
background image

ICS Triplex Turbo Machinery Control

PD-6050 Dec 04

8

Unpacking and Inspection

Upon receipt of the T6050, unpack it carefully and visually check for damage.

If anything is damaged, contact ICS Triplex for instructions for returning it to the factory. If
everything appears to be in order, proceed with the instructions in the following paragraphs.

Mounting

The following figure provides mounting dimensions for the T6050.

ics triplex

T6050

SurgeGard

5

6

7

5

T6050

SurgeGard

X5

X30

4mA

3.15"

(80)

0.79"

(20)

3.15"

(80)

0.79"

(20)

2.76"

(70)

2.98"

(75)

TOP VIEW

FRONT VIEW

SIDE VIEW

Figure 3. Mounting Dimensions

Advertising