Power up sequence – Rockwell Automation T823X Trusted Power System User Manual

Page 29

Advertising
background image

Trusted

TM

Power System T823X

Issue 9 Dec 08

PD-T823X

29

6.1. Power up sequence

When a power controller is connected to more than one power shelf, power shelves should have their
supplies applied in turn, e.g. power up first shelf (idents 1-3), followed by shelf two (idents 4-6) etc.
This ensures that the power pack addresses are not duplicated.

Advertising