Rack 1: do_test, Rack 2: state, Table 5 rack 1: do_test descriptions – Rockwell Automation T8449 Trusted TMR 24V dc Valve Monitor Module - 40 Channel User Manual

Page 24: Table 6 rack 2: state descriptions, Trusted, Module t8449

Advertising
background image

Trusted

TM

Module T8449

Issue 13 Apr 10

PD-T8449

24

3.2.1. Rack 1: DO_TEST

This board provides the connection to the logical output control signal for each of the field devices as
well as the valve test initiation signal.

Channel

Field
Device

Description

1

Control output command

2

1

Test initiation command

3

Control output command

4

2

Test initiation command

39

Control output command

40

20

Test initiation command

Table 5 Rack 1: DO_TEST descriptions

The user application should set the control output control signal to true (logic ‘1’) to turn ON or energise
an output, and false (logic ‘0’) to turn OFF or de-energise an output.

A valve test will be initiated on each rising edge of the test initiation signal when it is set to true (logic
‘1’). A falling edge of the test initiation signal when it is set to false (logic ‘0’) will reset the valve test and
clear all internal valve test data (such as the Valve Test State, Test Time variables, Samples ETIME,
and Sampled ESTATE). Valve test data such as Feedback Input Voltage, and the Command Time
variables are not cleared.

3.2.2. Rack 2: STATE

This board provides the majority voted numerical output state. This indicates the operational status of
the control output and feedback input for each field device.

Channel

Field
Device

Description

1

Control output state

2

1

Feedback input state

3

Control output state

4

2

Feedback input state

39

Control output state

40

20

Feedback input state

Table 6 Rack 2: STATE descriptions

Advertising